Merge "docs: describe migration and other movement concepts"
This commit is contained in:
commit
8970fc9e4f
@ -390,3 +390,136 @@ assigned at creation time.
|
||||
"accessIPv6":"::babe:67.23.10.132"
|
||||
}
|
||||
}
|
||||
|
||||
Moving servers
|
||||
~~~~~~~~~~~~~~
|
||||
|
||||
There are several actions that may result in a server moving from one
|
||||
compute host to another including shelve, resize, migrations and
|
||||
evacuate. The following use cases demonstrate the intention of the
|
||||
actions and the consequence for operational procedures.
|
||||
|
||||
**Shelving**
|
||||
|
||||
Sometimes a user does not require a server to be active for a while,
|
||||
perhaps over a weekend or at certain times of day. This gives
|
||||
the cloud operator an opportunity to make better use of resources by
|
||||
freeing resources and rebalancing workloads across the infrastructure.
|
||||
|
||||
When the user shelves a server the operator can choose to remove it
|
||||
from the compute hosts. When it is unshelved it is scheduled to a new
|
||||
host according to the operators policies for distributing work loads
|
||||
across the compute hosts, including taking disabled hosts into account.
|
||||
This will contribute to increased overall capacity, freeing hosts that
|
||||
are ear-marked for maintenance and providing contiguous blocks
|
||||
of resources on single hosts due to moving out old servers.
|
||||
|
||||
Shelving a server is not normally a choice that is available to
|
||||
the cloud operator because it affects the availability of the server
|
||||
being provided to the user.
|
||||
|
||||
**Resize**
|
||||
|
||||
Sometimes a user may want to change the flavor of a server, e.g. change
|
||||
the quantity of cpus, disk, memory or any other resource. This is done
|
||||
by rebuilding the server with a new flavor. As the server is being
|
||||
rebuilt it is normal to reschedule the server to another host
|
||||
(although resize to the same host is an option for the operator).
|
||||
|
||||
As with shelving, resize provides the cloud operator with an
|
||||
opportunity to redistribute work loads across the cloud according
|
||||
to the operators scheduling policy, providing the same benefits as
|
||||
above.
|
||||
|
||||
Resizing a server is not normally a choice that is available to
|
||||
the cloud operator because it changes the nature of the server
|
||||
being provided to the user.
|
||||
|
||||
**Migration (including cold and live migration)**
|
||||
|
||||
Sometimes a cloud operator may need to redistribute work loads for
|
||||
operational purposes. For example, the operator may need to remove
|
||||
a compute host for maintenance or deploy a kernel security patch that
|
||||
requires the host to be rebooted.
|
||||
|
||||
The operator has two actions available for deliberately moving
|
||||
work loads: cold migration (moving a server that is not active)
|
||||
and live migration (moving a server that is active).
|
||||
|
||||
Cold migration moves a server from one host to another by copying its
|
||||
state, local storage and network configuration to new resources
|
||||
allocated on a new host selected by scheduling policies or as
|
||||
an explicit decision. The operation is relatively quick as the
|
||||
server is not changing its state during the copy process. The user
|
||||
does not have access to the server during the operation.
|
||||
|
||||
Live migration moves a server from one host to another while it
|
||||
is active, so it is constantly changing its state during the action.
|
||||
As a result it can take considerably longer than cold migration.
|
||||
During the action the server is online and accessible, but only
|
||||
a limited set of management actions are available to the user.
|
||||
|
||||
The following are two common patterns for employing migrations in
|
||||
a cloud:
|
||||
|
||||
- **Host maintenance**
|
||||
|
||||
If a compute host is to be removed from the cloud all its servers
|
||||
will need to moved to other hosts. In this case it is normal for
|
||||
the rest of the cloud to absorb the work load, redistributing
|
||||
the servers by rescheduling them.
|
||||
|
||||
To prepare the host it will be disabled so it does not receive
|
||||
any further servers. Then each server will be migrated to a new
|
||||
host by cold or live migration, depending on the state of the
|
||||
server. When complete, the host is free to be removed.
|
||||
|
||||
- **Rolling updates**
|
||||
|
||||
Often it is necessary to perform an update on all compute hosts
|
||||
that requires them to be rebooted. In this case it is not
|
||||
strictly necessary to move inactive instances because they
|
||||
will be available after the reboot. However, active instances would
|
||||
be impacted by the reboot. Live migration will allow them to
|
||||
continue operation.
|
||||
|
||||
In this case a rolling approach can be taken by starting with an
|
||||
empty compute host that has been updated and rebooted. Another host
|
||||
that has not yet been updated is disabled and all its servers are
|
||||
migrated to the new host. When the migrations are complete the
|
||||
new host continues normal operation. The old host will be empty
|
||||
and can be updated and rebooted. It then becomes the new target for
|
||||
another round of migrations.
|
||||
|
||||
This process can be repeated until the whole cloud has been updated,
|
||||
usually using a pool of empty hosts instead of just one.
|
||||
|
||||
Migrating a server is not normally a choice that is available to
|
||||
the cloud user because the user is not normally aware of compute
|
||||
hosts. Management of the cloud and how servers are provisioned
|
||||
in it is the sole responsibility of the cloud operator.
|
||||
|
||||
**Evacuate**
|
||||
|
||||
Sometimes a compute host may fail. This is a rare occurrence, but when
|
||||
it happens during normal operation the servers running on the host may
|
||||
be lost. In this case the operator may recreate the servers on the
|
||||
remaining compute hosts using the evacuate action.
|
||||
|
||||
Failure detection can be proved to be impossible in compute systems
|
||||
with asynchronous communication, so true failure detection cannot be
|
||||
achieved. Usually when a host is considered to have failed it should be
|
||||
excluded from the cloud and any virtual networking or storage associated
|
||||
with servers on the failed host should be isolated from it. These steps
|
||||
are called fencing the host. Initiating these action is outside the scope
|
||||
of Nova.
|
||||
|
||||
Once the host has been fenced its servers can be recreated on other
|
||||
hosts without worry of the old incarnations reappearing and trying to
|
||||
access shared resources. It is usual to redistribute the servers
|
||||
from a failed host by rescheduling them.
|
||||
|
||||
Evacuating a server is solely in the domain of the cloud operator because
|
||||
it must be performed in coordination with other operational procedures to
|
||||
be safe. A user is not normally aware of compute hosts but is adversely
|
||||
affected by their failure.
|
||||
|